Skip to main content

Our latest SSUK Pulastic Facelift in Manchester

Project details

Construction Date

Winter 2025

Category

Pulastic Facelift

Description

Project Overview:  A 605 sqm sports hall floor in Manchester underwent a Sports Surfaces Pulastic Facelift.
This refurbishment was carried out for a facilities management firm as part of their ongoing lifecycle maintenance plan for their client.
The process:
– Sanding & repairing the existing surface
– Applying a fresh polyurethane top coat
– Precision court markings for a professional finish
Key Benefits:
– Enhanced Performance – Restores grip and playability
– Cost-Effective – Extends floor lifespan without full replacement
– Minimal Downtime – Faster turnaround for facility use  Sustainable – – Reduces waste by refurbishing rather than replacing
This project successfully delivered a like-new sports floor, ensuring a high-quality playing experience while maintaining sustainability and efficiency.
Click here for further Pulastic Facelift information. 

For a free quotation please call 01244 321 200

X