Newman University Summer Pulastic Facelift
Project details
Construction Date
August 2019
Category
Pulastic Facelift
Description
In August 2019 Alf and the team installed a 680 sqm Pulstic Facelift at Newman University, working with Wilby Building Services Ltd.
The Pulastic facelift was an ideal way of reusing the existing surface so reducing strip out costs in just four easy steps:
- A full sand and seal to the existing floor
- Applying a Pulastic polyurethane layer
- Painting the floor a very modern iron grey
- Next stop court marking, final pictures to follow – what a transformation!