Liverpool College gets a facelift
Project details
Construction Date
January 2022
Category
SSUK Pulastic Facelift
Description
Our latest 1257 sqm pastel blue SSUK Pulastic Facelift
8 badminton courts
2 netball courts
2 5-a-side soccer courts
The ‘SSUK Pulastic Facelift’ involves a new layer of self-levelling polyurethane installed over the existing surface, effectively providing a new floor at a reduced cost and reduced down-time without the requirement for a full ‘strip out’.
We hope Liverpool College love their new blue floor.
Speak to the team today for further Facelift information.