New Pulastic floor for The Deanery CE High School and Sixth Form College, Wigan
Project details
Construction Date
Autumn 2025
Category
New Pulastic 110 Multiuse Sports Floor
Description
Project Scope:
Replacement of existing vinyl sports flooring.
Existing Surface:
Vinyl – uplift and removal.
New Installation:
System: Pulastic Classic 110
Area: 18m x 32m (576m²)
Colour: Capri Blue (309)
Overview:
The project at The Deanery CE High School and Sixth Form College involved upgrading the sports hall surface. The outdated vinyl floor was removed and replaced with the Pulastic Classic 110 system — a seamless, multi-purpose sports surface ideal for school and community use.
The new Capri Blue (309) finish provided a vibrant look, while the Pulastic system delivers excellent shock absorption and long-term resilience, ensuring a safe and high-quality environment for students and staff.
Thinking about upgrading your own sports flooring?
Get in touch with our team today to discuss how we can transform your space with a Pulastic surface built to last.



