Brookfield School Vinyl Floor Uplift & Installation

Project details

Construction Date

Summer 2025

Category

Vinyl Floor Uplift & Pulastic Classic 110 Installation

Description

For this project, we carried out a full uplift of an old vinyl sports floor using heavy-duty stripping machines, ensuring all adhesive beneath was completely removed. The old materials were taken off-site for safe disposal, leaving a clean base ready for installation.

We then supplied and installed the SSUK Pulastic Classic 110 system, followed by court markings and door threshold strips to complete the hall to a professional standard.

The result is a smart, durable, high-performance floor – and the school is over the moon with their new surface, delivered just in time for the new school year.