Beckfoot School – Studio Refurbishment
Project details
Construction Date
Summer 2025
Category
Floor Refurbishment, Pulastic Facelift
Description
This project was a small 82sqm refurbishment of an existing polyurethane floor in a studio at Beckfoot School in Bingley.
The order followed the success of an earlier installation carried out in the school’s small hall the year before.
The original studio floor was worn and patchy, showing heavy use over time. Using the SSUK Pulastic Facelift system, we were able to prepare and repair the surface before installing a new layer of polyurethane over the top. This approach reused the existing floor while giving it a completely fresh finish, delivering the look and feel of a brand-new installation.
By choosing the Pulastic Facelift, the school benefitted from a cost-effective and sustainable solution that extended the life of their sports flooring, while ensuring a smart, durable surface ready for years of future use.
Check out the before, during and after images below.




